Task-by-task docs plan: author ADR-018 and reconcile ADR-002, accepted-risks (R4), CAPABILITIES, ADR-012, STATUS, TODO, CLAUDE.md. Roles/pipeline deferred on the base + service-role machinery. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| 2026-06-01-hardware-capacity.md | ||
| 2026-06-05-mesh-vpn-netbird.md | ||
| 2026-06-05-service-ui-verification.md | ||
| 2026-06-05-ubongo-control-host.md | ||
| 2026-06-06-logging-log-integrity.md | ||